Armenian Small Municipalities Water project

  • Employer:  
    "Armenian Water and Sewerage Company" CJSC
  • Financing organization:  
    EBRD
Project objective

To assist the Armenian Water and Sewerage CJSC (Employer) and the Water Committee in construction and rehabilitation of water supply systems in 17 towns and villages, as well as in construction of wastewater systems in 6 towns and wastewater treatment plants (mechanical part) in 2 towns. 

Phases of engineering consulting services 

  • Phase 1. Implementation of engineering investigations and preparation of preliminary design
  • Phase 2. Preparation of Detailed Design and Bidding Documents 
  • Phase 3. Assessment of construction bid packages
  • Phase 4. Author’s and technical supervision

Rendered engineering consulting services

  • Preparation of preliminary design
  • Preparation of design and cost estimation documentation
  • Implementation of Design Author’s Supervision
  • Technical supervision of construction
  • Project management
  • Technical assistance and training
  • Contract management 
  • Tender process, including organization and evaluation
  • Disbursement management
  • Project objective
  • Project objective
Sub-projects
  • Rehabilitation of the Water Supply System in Abovyan and Byureghavan
  • Rehabilitation of the Water Supply System in Sevan
  • Rehabilitation of the Water Supply and Wastewater Systems in Dilijan
  • Rehabilitation of the Water Supply System in Tashir
  • Rehabilitation of the Water Supply System in Gavar and Sarukhan
  • Rehabilitation of the Water Supply and Wastewater Systems in Martuni
  • Rehabilitation of the Water Supply System in Chambarak 
  • Rehabilitation of the Water Supply and Wastewater Systems in Akhtala, Spitak and Jrashen
  • Rehabilitation of the Water Supply and Wastewater Systems in Kapan
  • Rehabilitation of the Water Supply System in Artik
  • Rehabilitation of the Wastewater System in Jermuk
  • Rehabilitation of the Water Supply and Wastewater Systems in Ijevan and Azatamut
  • Rehabilitation of Wastewater Treatment Plants in Dilijan and Jermuk
  • Sub-projects
  • Sub-projects
  • Sub-projects
Main characteristics of the project
  • 17 towns and villages with a total population of 270,000
  • Wastewater treatment plants in Jermuk (110 l/s) and Dilijan (200 l/s) according to FIDIC yellow book
  • L=426 km, DN820-63 mm transmission mains and distribution networks in Abovyan, Byureghavan, Sevan, Dilijan, Tashir, Gavar, Sarukhan, Martuni, Chambarak, Akhtala, Spitak, Jrashen, Kapan, Artik, ljevan and Azatamut (according to FIDIC red book) 
  • L=31 km, DN800-160 mm wastewater networks in Dilijan, Jermuk, Kapan, Martuni, Ijevan and Azatamut
  • Different structures: river intakes, spring tappings and deep wells, reservoirs, pumping stations, chlorination stations